Info
You are currently browsing the Hudson Valley - cycling adventures and area trailway reports weblog archives for the day 11. August 2009.
Calendar
Categories
- Uncategorized (49)
Latest Postings
- 25. August 2010: Hudson Valley Rail Trail - phase 2 construction
- 17. August 2010: Dutchess Rail Trail - phase3
- 12. August 2010: Walkway OTH report
- 23. July 2010: Hudson Valley Rail Trail - phase 2 construction
- 14. July 2010: Dutchess Rail Trail - phase 1,2,3
- 28. June 2010: Hudson Valley Rail Trail - phase 2 construction
- 20. June 2010: Dutchess Rail Trail - phase 3
- 16. June 2010: Memorial Day Weekend 2010
- 14. June 2010: Trailways Report
- 17. May 2010: Hudson Valley Rail Trail - phase 2 construction
Links
Archives
Archive for 11. August 2009
trailway report
11. August 2009 by Kevin.
WALKWAY OTH
08-11-9
The east crew, and decking, are over the Metro North RR yard in Poughkeepsie. The west crew are over the pavilion behind the Children’s Museum on Water Street. A welder from the east crew was doing some welding along the edge on top of the bridge where the decking is placed. There was also work being done on the east end access area next to the junkyard. A buldozer was clearing and leveling. I could see an old concrete abutment/wall on the old RR ROW.