WALKWAY OTH

east end C.O.P. – working on railings over Mt. Carmel Pl. – on Dutchess Ave. work underneath bridge seemed to be done just for today? or maybe completed – I viewed big crane at west end from Pok. RR station – the big crane was in motion not sure if a walkway deck section was being installed – working at base of #3 bent (from west end – #2 from this end)┬áin water I saw a boat moving away from pier

DUTCHESS RAIL TRAIL

behind the rt. 44 plaza – Stop and Shop et al. – at end of Love Rd. I saw paving roller machine going SB on RT – smoothing down gravel base for asphalt – there did not seem to be any work for official access at this point